Technical Data ( 學手藝產品參數 )
燃油:地埋管清新氣 NG
Fuel:NG
熱值: 8500kcal/m3
Calorie Value:8,500kcal/m3
天燃氣進口量氣壓Inlet: 350mbar to 1000mbar.
Inlet Gas pressure: 350mbar to 1000mbar
燒嘴效率: 630Kw /1500Kw 1:10
Burner Capacity: Max 630Kw/ 1500Kw
灶具工作溫暖: Max 780℃
Furnace Temperature: Max 780℃
優點: 熔鋅硬質合金及熱氣生成器
Function: Zinc Pot melt and hot air generator
燒嘴種數: 4 支 (630Kw 2pcs; 1500Kw 2pcs) +純體式的然氣機一款套
CONTROL PANEL:
有節制柜:
The following control panel will be rack mounted and pre-wired to the gas train:
自力的控制柜被計劃在近日的道德水準,大小與近日相當,內部設置有兩個濕度記實儀, 還有每件事冗余布線都提升裝置終了:
Supply voltage 415/230/1/50Hz
供求關系電流415/230/1/50Hz
Krom//schroeder Flame Safeguard
Krom//schroeder火苗英式放肆器
Krom//schroeder Keyboard/Display Unit, (Flame signal indicator)
Krom//schroeder 內容輸出琴鍵/突顯電源模塊(藍色火焰旌旗燈號唆使)
(1) Krom//schroeder l Self-Check UV Scanner
Krom//schroeder 紫外線烈焰觀測(帶自查藥用價值)
VX700R color paperless recorder( VX700R型無紙溫記實儀)
Purge Timer
吹掃定時繼設備
Pilot Interrupt Timer
焚燒爐爐焚燒爐爐定時繼小家電
Power On/Off Switch
按鈕開關電源按鈕開關
Burner On/Off push buttons
揮發器觸點開關旋鈕
High temperature limit controller with display
高溫英式放肆器(帶數顯壓力表藥理作用)
(1) Type K Thermocouples
J型熱電偶溫度計
Ignition transformer and wire
梵燒干式變壓器及連線
Indicator lights for:
唆使燈顯現出:
Power on(得電)
Interlocks proven(互鎖經途環節)
Purging(吹掃)
Purge complete 吹掃保證(Ready to start承辦燃燒)
Pilot On母火開
Main Burner On熔化器高速運行
Flame Failure Alarm烈焰引燃短信報警
An alarm-fault light reset pushbutton is employed to reset the alarm indicators. An emergency stop push button is also included. These pushbuttons are also door mounted.
帶報案唆使的回位按紐,可以回位報案。還包涵告急停按紐。以下按紐都試驗裝置在合理柜臺板上。
PROCESS AIR FAN INCLUDED
工藝設計通風機
AIR Fan with approximately 3000m3/hr and 9000Pa 3 sets
3套供排風量為3000立米米/個小時,氣壓為7800-9000Pa的離心法式軸流風扇;此中:熔鋅爐2臺燒嘴同時一個軸流風扇 ;
Flanged process air inlet and outlet with companion flanges
國家標準法蘭片毗連的工藝流程風美國進口和產品出口
CONSTRUCTION FEATURES:
引擎涂裝事變
All Gas piping painted “Yellow”
一切都是管道煤氣導壓管-噴漆藍色
Rack surfaces and components painted “White”
架裝外貌和零件-顏色
Control Panel enclosure “Power Coating RAL 1008”
規范柜噴塑一汽豐田白
Heater Section painted “Silver”
爐體不規則-銀紅白色
DOCUMENTATION:
提貨材料:
System operation manuals will be provided for the skids, which include:
網絡體系調控手則,涉及到:
Electrical schematic pre-wire drawing
電路板圖
Mechanical Drawings
機子組裝流水線圖
Recommended Spare Parts Lists
保舉維修工具明細
Component literature
器件表
Pipe train test sheets
液壓管路測試測試品種表
PRE- TESTING:
試運前測試測試
The following pre- tests and inspections will be performed at Job side:
下面的考試和審單將在現象裝設終了后論文檢測
All pressure switches will be tested for correct operation using Air, regulated to demonstrate trip point, both rising for high-pressure switches and decreasing for low-pressure switches.
每件事心理壓力電開關原機前都將根據良好氛圍終止打壓測試軟件,
All pressure gauges shall be tested for correct readings.
每件事壓差表都顛末打壓測試儀并規定讀數
All safety shut off valves will be tested to confirm proper opening and closing sequences.
一切都幽靜封控閥都顛末啟動和關閉工作措施公測
All control valves will be tested for full range of motion.
一切的合理閥都顛末全路線強化措施公測
All wiring and terminals will be checked for proper routing and continuity.
這一切接電源和接線端子都顛末嚴酷查抄
The entire pipe train will be pressure tested to at least 1.5 times the maximum operating pressure and verified to be leak free.
線路管理體系顛末打壓軟件測試英文,軟件測試英文壓差至少為比較大級任務壓差1.5倍。